The Costal Construction began work in March 2004, completion was at the winter of 2005 and beginnings of 2016. The building was developed by Sun Vest Communities USA and it holds 142 exquisite units with multiple floor plans ranging in size from 811 to 4,556 Sq.Ft. The condo’s distinctive glass structure design was in charge of Fullerton Diaz Architects.
This magnificent condo boasts elegant residences with spacious terraces for breathtaking panoramic views, and sophisticated amenities including; pro grade fitness center, infinity edge pool and spa, business center, landscaped terraces, wine cellar, Emerald Club, rooftop sky club, grand arrival lobby and sun deck, besides high quality services such concierge, 24-hour manned security and valet parking. Units for sale from high $200k’s. Visit us at http://www.emeraldatbrickelll.com/
Condo Profile:
Year Built: 2006
Bedrooms: 1-3
Total Units: 142
Sq Ft Range: 811-4,556
Hours of Operation: MON – SUN 7:00 AM 11:00 PM
Email: info@emeraldatbrickelll.com